The so-called single machine test is that when the dust collector selects the pneumatic power control valve, the staff must first turn on the compressed air, check the tightness of the air circuit system, check whether the pneumatic components can work normally ; the ash conveying system is energized and tested, and the inspection is normal. For the work, when using the blower fan, power on the fan and test the car. After working normally, turn off the blower.
Simulated no-load test: Firstly, check the smoothness of the solenoid valve, exhaust valve, feeder, screw conveyor line and the opening and closing of the valve one by one, and then press the timing control time to complete the whole process of each room according to the electronic control program. Ash, linkage debugging: close all inspection doors and manhole doors, start the system fan ; adjust the load of each filter unit to make it reach the basic balance. Use the pitot tube and U -shaped pressure gauge to measure the dynamic pressure value at each inlet branch pipe, and adjust the butterfly valve on the inlet branch pipe. The filtered air volume of each unit is basically equal. After adjusting, mark the butterfly valve with red paint and lock. Tight handle.
Real-load operation: The process equipment is officially operated, the dust collector is officially operated to filter and dust, and the PLC program controller is officially put into operation. The operating components and valves are inspected at any time, and the operating parameters are recorded. For example, according to the timing control, the dust collector should be installed. When the resistance reaches the specified resistance value ( such as 1500 ~ 1700) , manually turn on the PLC program controller to clean the filter bag, stop after the room is cleaned, and then the statistical resistance will reach the specified value again, then manually turn on the PLC program control. The instrument is used to clean the filter bag, and the cycle is repeated several times. After the smooth interval between the secondary cleaning cycles is obtained, the time data can be used as the base of the “timing” control of the program controller, and the program controller is input, and then the program is controlled. The instrument can be officially operated by automatic “timing control”.
July 03, 2023
Bu tedarikçi için e-posta
July 03, 2023
November 29, 2021
November 25, 2021
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.